Century Mine Project
Lead Contractor:
Sedgman
Electrical Contractor:
National Pump and Energy
Scope of Works:
SES was tasked with the delivery of the three containerised 40foot switch rooms which included the Motor Control
Centres, Air and Fire Systems, PLC Panels, VSD’s, Additionally SES supplied the Main Site Switchboard at 4000amp with a 63kA fault level.